Last updated October 15, 2026
Seasonal ADU Care for Houston: Year-Round Homeowner’s Guide
Most ADU maintenance advice you’ll find online was written for places with four actual seasons. Houston doesn’t have four seasons. Houston has two punishing extremes and two brief transition windows, and if you maintain an accessory dwelling unit on a traditional spring/summer/fall/winter calendar, you will miss every critical intervention point the Gulf Coast climate actually demands. This guide walks through the real maintenance calendar for a Houston ADU, what breaks first, what you can safely handle yourself, and what tasks belong to a tenant versus a landlord under Texas law; for ADU Permits, Codes & Inspections in TX: What You Need to Know, see our separate resource. We’ve maintained and repaired detached units across the Houston metro since 2006, and we’re going to tell you what we actually see in the field, not what a generic maintenance blog says.
Quick Answer
Houston ADU maintenance runs on a four-point calendar: pre-hurricane prep in April, peak-heat stress checking in June, post-storm inspection in October, and a short caulking and sealing window in January when the air is dry enough for sealants to cure properly. The highest-ROI task costs about $12 and takes 20 minutes: clearing the condensate drain line before summer heat arrives. A clogged line in July can dump enough water to warp a small ADU’s subfloor in 48 hours.
Table of Contents
- Houston’s Real Maintenance Calendar: Four Intervention Points, Not Four Seasons
- The $12 Task That Prevents a $3,000 Repair: Condensate Drain Maintenance
- Pre-Hurricane ADU Prep: The April Checklist
- Peak-Heat Stress Check: What June Does to a Detached Unit
- Houston Clay Soil and Pier-and-Beam ADU Foundations: What Movement Is Normal
- Post-Storm Inspection: The October Walkthrough
- The Pre-Freeze Protocol: Protecting ADU Plumbing on the 3-5 Nights Houston Drops Below 28°F
- Landlord vs. Tenant Responsibilities for Rental ADUs Under Texas Property Code
- Common Mistakes to Avoid
- When to Call a Professional
- Frequently Asked Questions
- The Bottom Line
Houston’s Real Maintenance Calendar: Four Intervention Points, Not Four Seasons
Here is the calendar we use when we build and maintain ADUs in Houston. If you remember nothing else from this guide, remember these four windows.
April: Pre-Hurricane Prep. Hurricane season officially starts June 1, but the smart money in Houston prepares in April. This is when you inspect roof flashing, clear gutters and downspouts on the ADU, check that exterior doors seal tightly, and verify the drainage grade around the unit still slopes away from the slab or piers. You want this done before the first named storm forms in the Gulf, not when it’s three days out and every contractor in Harris County is booked solid.
June: Peak-Heat Stress Check. By June, daytime highs in Houston routinely cross 95°F with humidity that makes the air feel like a wet blanket. This is when a detached ADU’s HVAC system works hardest, because a small standalone structure has no shared wall mass with a main house to buffer temperature swings. June is the month to clear the condensate drain line, replace the air filter, and listen for any new sounds from the compressor. More on this below, because it’s the single most important task on this list.
October: Post-Storm Inspection. Houston gets an average of 45 inches of rain per year, but much of it arrives in concentrated events. After the summer storm season winds down, walk the entire ADU perimeter. Look for soil erosion around piers, water staining on the siding or soffits, soft spots near door thresholds, and any sign that wind-driven rain found a way inside. October is also the right time to check the roof for lifted shingles or damaged flashing after a season of storms.
January: The Caulking and Sealing Window. Houston’s relative humidity in July and August often sits above 80 percent, which means caulk, exterior sealant, and weatherstripping adhesive cannot properly cure if applied then. They skin over on the surface and fail underneath. January is Houston’s driest month, with humidity often dropping below 50 percent for multi-day stretches. That is when you recaulk exterior joints, replace weatherstripping around the ADU’s door, and reseal any exterior penetrations. If you apply these materials in January, they will last three to five years. Applied in July, you’ll be redoing the work the following spring.
One note for anyone who just completed a build or a Home Addition Contractor in Houston project with us: the sealant work done during construction follows the same logic. If your build wrapped up in August, check the caulk lines in January. Even professional-grade sealants benefit from a dry-air cure.
The $12 Task That Prevents a $3,000 Repair: Condensate Drain Maintenance
Here is the task every Houston ADU owner should know about. Your air conditioner produces condensation, and that water has to go somewhere. On a properly installed unit, it flows through a PVC drain line to the outside. In Houston’s warm, humid environment, algae and mold grow inside that line. Left unchecked, it clogs. The water then backs up into the drain pan, and when the pan overflows, the water goes where it should never go: into the ceiling, down the walls, or across the floor.
In a small ADU of 400 to 600 square feet, a backed-up condensate line can put gallons of water into the interior in under 48 hours of continuous AC operation. We have seen the result: warped subfloor, ruined vinyl plank flooring, soaked drywall, and baseboard trim that has to be pulled and replaced. The repair bill commonly lands between $2,500 and $3,500. The prevention costs about $12 and takes 20 minutes.
Here is how to do it in a Houston ADU:
- Locate the drain line. You’re looking for a PVC pipe, usually 3/4-inch, coming off the indoor air handler or the outdoor condensate pump. In most Houston ADUs, it exits near the exterior wall closest to the HVAC closet.
- Find the access point. Many installers leave a capped tee or a cleanout port on the line. If yours has one, you’re in luck. If not, you can access the line where it exits the structure.
- Attach a wet-dry vac. Use duct tape to create a seal between the vac hose and the open end of the drain line. Run the vacuum for 30 to 60 seconds. In most cases, you will hear the clog release and the vacuum will pull out a slug of algae and slime.
- Flush the line. Pour a cup of white vinegar or a 50/50 mix of white vinegar and warm water into the line from the inside access point. This kills residual growth and slows future buildup. Do not use bleach. Bleach can damage PVC over time and its fumes are unpleasant in a small, enclosed ADU.
- Test the system. Run the AC for 30 minutes and confirm water is dripping from the exterior end of the line.
Do this in early June, then again in mid-August if the summer has been especially humid. For most Houston ADUs, twice a year is enough. If your unit uses a condensate pump rather than a gravity drain, the same principle applies: the pump reservoir can also clog with algae, and a failed pump means the water goes somewhere else. If you can hear the pump running continuously or cycling when the AC is off, replace it. A basic condensate pump runs $45 to $80 at any Houston hardware store and takes about an hour to swap if you’re comfortable with basic wiring.
Pre-Hurricane ADU Prep: The April Checklist
Houston ADUs face different storm risks than the main house on the lot. A detached unit has a smaller roof surface, which means water concentrates faster at the eaves and valleys during a heavy downpour. It also means the roof pitch is often shallower than on a primary residence, especially on prefab or modular units. A shallow-pitch roof sheds water more slowly, which gives water more time to find a way in.
Here is the April pre-hurricane checklist we recommend for every detached ADU in the Houston area:
- Inspect all roof flashing. Pay particular attention to the flashing around any roof penetrations: vent pipes, exhaust fans, the HVAC line set, and skylights if your unit has them. Houston’s heat and UV exposure makes sealant brittle faster than in cooler climates, and a 1/8-inch gap in flashing sealant is enough to let in significant water during a tropical downpour.
- Clear the gutters and downspouts. ADU gutters are often undersized relative to the roof, because the structure is small and the builder saved money. That means they clog faster and overflow sooner. During a 3-inch-per-hour Houston thunderstorm, a clogged downspout will dump water directly against the foundation or pier line. Clear them in April and again in August.
- Check the drainage grade. Walk around the unit with a level or just your eyes. The ground should slope away from the foundation or piers at about 1 inch per foot for the first 6 feet. If Houston’s clay soil has settled unevenly, you may see low spots holding water after rain. Fix low spots with compacted fill before hurricane season arrives.
- Verify door and window seals. Wind-driven rain in Houston doesn’t fall straight down. It comes at an angle, sometimes nearly horizontal. Run your hand around the exterior perimeter of all doors and windows and feel for gaps. Replace worn weatherstripping now, not in June.
- Anchor anything not bolted down. This includes outdoor furniture near the ADU, potted plants, trash bins, and any unsecured HVAC covers. In a 70-mph gust, a plastic chair becomes a projectile that can break a window or dent siding.
- Photograph the unit. Take dated, exterior and interior photos of the ADU before hurricane season starts. If you file a claim after a storm, pre-storm documentation speeds up the process considerably.
For units we’ve installed or maintained as ADU Builders in Houston, we recommend doing this April walkthrough the same week you file your homestead exemption paperwork for the year, because both tasks happen once annually and combining them reduces the chance you’ll skip one.
Peak-Heat Stress Check: What June Does to a Detached Unit
A detached ADU in Houston heats up differently than a single-family house. A primary residence has a large thermal mass, often brick or stone on at least one elevation, and its HVAC system is sized for that mass. A small ADU, particularly a panelized prefab from a brand like Mighty Buildings or a modular like Boxabl, has much less thermal mass. The walls are thinner relative to the interior volume. The air changes over faster. And because the unit stands alone in direct sun with no shared wall, the HVAC system works harder for its square footage than any system in the main house.
June is the month to do these five checks:
- Clear the condensate drain line. Already covered above. Do not skip this one.
- Replace the air filter. In Houston’s humid, pollen-heavy spring, a standard 1-inch filter can load up in 60 days. A loaded filter restricts airflow, which causes the evaporator coil to freeze, which further restricts airflow, which eventually shuts down the system. Filters cost $5 to $20. System service calls start around $150. Replace filters on a 60-day schedule in Houston, not the 90-day national average.
- Check the exterior compressor unit. Houston grass grows fast in the spring. If the condenser unit is surrounded by overgrown grass, shrubs, or accumulated leaves, airflow suffers. Clear a minimum 2-foot radius around the unit. Also look for rust on the housing and any signs of oil at the line set connections. Oil staining means the coil or fitting may have a slow leak, and a system low on refrigerant will run constantly without cooling properly.
- Listen to the system cycle. Turn the thermostat down 5 degrees. Go outside and listen. A healthy compressor has a smooth, consistent hum. A compressor that clicks on and off rapidly, or hums loudly then shuts down within seconds, is failing. Catching this in June is why you get a $300 capacitor replacement instead of a $3,000 compressor replacement in August.
- Test the dehumidification effect. Your ADU’s AC is doing two jobs in Houston: cooling the air and removing moisture. If the unit feels cold but damp, or if you see condensation on windows in June, the system is probably short-cycling. That means it’s oversized for the space, a common problem in small ADUs where contractors install a “standard” system instead of one sized for a 500-square-foot detached unit. Short-cycling systems cool the air but don’t run long enough to pull humidity out. The fix is often a dehumidifier added to the system or a rebalancing of the AC’s run cycles. Talk to an HVAC pro who has experience with detached suites specifically, not just residential systems.
If you’re evaluating a Room Addition Contractor in Houston or ADU builder before you build, ask about HVAC sizing methodology for detached units. If the answer is “we use a standard rule of thumb per square foot,” keep looking. A properly sized and installed mini-split in a small Houston ADU should be able to maintain 74°F at 50% relative humidity on a 98°F day, and the only way to know that is to run a Manual J load calculation for the specific unit, orientation, and window package. Sutton ADU Houston runs that calculation on every build, and it’s one reason our units hold temperature on Houston’s worst days.
Houston Clay Soil and Pier-and-Beam ADU Foundations: What Movement Is Normal
Houston sits on expansive clay soil. The technical term is Beaumont clay, and it behaves like a sponge. When it gets wet, it swells. When it dries, it shrinks and cracks. In late summer, after weeks without rain and with temperatures above 95°F, the soil around and under a pier-and-beam ADU can pull away from the piers by over an inch. This is normal. The ground also develops surface cracks, some wide enough to fit a finger. That is also normal.
What is not normal is differential movement: one corner of the ADU settling more than the others, doors that stop latching, windows that bind, or cracks in the drywall that appear suddenly and grow over a few weeks. Here is how to tell the difference.
Normal summer movement in a Houston ADU:
- Hairline cracks in drywall at door and window corners, appearing in August, closing slightly in October.
- Doors that stick mildly during a dry spell, then close fine after a good rain.
- Small gaps between pier tops and the beam, visible in late summer, closing during wet months.
- Surface soil cracks around the perimeter that do not extend below 12 inches.
Movement that warrants a structural call:
- Any crack wider than 1/4 inch, or any crack that runs diagonally across a wall instead of at a corner.
- A door that suddenly won’t latch at all, and stays stuck regardless of weather.
- Windows that crack under normal operation.
- A pier visible at ground level that has shifted off the beam by more than 1/2 inch.
- Water pooling in the crawl space rather than draining through or around it.
If you see these signs, do not wait. Houston clay moves slowly until it doesn’t, and a pier that loses contact with its beam transfers load to the remaining piers, which can then overload them. The structural repair is generally cheaper and less invasive when caught early, so watch for ADU Warning Signs: A Houston Homeowner’s Reference Guide. A foundation contractor who works regularly with pier-and-beam in the Houston area can re-shim the beam or add supplemental piers before the movement causes wall or floor damage.
One last note on foundations: if your ADU is on a slab rather than pier-and-beam, the warning signs change. Look for cracks in the slab itself wider than 1/8 inch, separations between the slab and the interior walls, or tile that pops loose in a line across the floor. Houston slab movement is also tied to the wet-dry cycle, but it behaves differently than pier movement, and the repair method differs too.
Post-Storm Inspection: The October Walkthrough
By October, Houston’s most intense weather is usually behind us for the year. The air starts to dry out, the afternoon highs drop into the high 80s, and the ground is typically saturated from a summer of storms. That saturated soil is exactly why October is the right time to walk the ADU.
Here is the post-storm inspection sequence we use on Houston ADUs:
- Start at the roofline and work down. Look for missing or lifted shingles, cracked flashing, dented gutters, and any debris still sitting on the roof. A small branch that sat on a shallow-pitch prefab roof all summer may have worn through the membrane. Remove it and check underneath.
- Check the soffit and fascia for water staining. Staining means water ran behind the gutter at some point during the summer. The source may have been an overflowing gutter, a failed drip edge, or wind-driven rain. Either way, the stain means water touched wood, and wood in Houston’s humidity is a mold risk within weeks.
- Walk the perimeter and look at the ground line. The soil should still slope away from the foundation or piers. If a summer of rain has washed soil away from the structure, you’ll see bare spots or channels. Replace the soil and compact it. If you have a pier-and-beam unit, check that the crawl space is dry and that no standing water remains from the summer.
- Open every exterior door and window. They should operate smoothly. If a door that worked fine in May now drags or sticks, the frame or the foundation may have shifted during the summer drought cycle. Refer to the foundation section above for what’s normal versus concerning.
- Run the AC for 30 minutes with the doors closed. Confirm the condensate is still flowing out the drain line and not into the unit. If you smell anything musty when the AC first kicks on, that’s often a sign that moisture accumulated in the ductwork or the drain pan during the summer. A professional duct cleaning or pan service may be in order.
- Check for pest intrusion. Houston’s warm, wet summer drives rodents, roaches, and ants to seek dry shelter. Look for droppings along the baseboards, in the kitchen cabinets, and around the water heater. Also inspect the exterior for gaps around pipe penetrations and cable entries, and seal any opening larger than 1/4 inch. In pier-and-beam ADUs, check the crawl space screening.
This October walkthrough takes about 45 minutes if you do it thoroughly. It is the cheapest insurance you can buy for a Houston ADU.
The Pre-Freeze Protocol: Protecting ADU Plumbing on the 3-5 Nights Houston Drops Below 28°F
Houston gets a hard freeze roughly every other winter. A “hard freeze” in this context means the temperature drops below 28°F for more than four hours. On those nights, exposed plumbing in a detached ADU is at genuine risk, and the risk is higher in a small unit than in the main house because there’s less ambient heat mass keeping the air temperature above freezing.
Here is the freeze protocol we recommend for Houston ADU owners. Print it and keep it somewhere you’ll actually remember, because you’ll only need it three to five nights a year, which means you’ll forget the details between freezes.
- Disconnect all exterior hoses. In Houston, the most common freeze casualty is an interior pipe that split because the exterior hose bib froze and the pressure wave traveled back into the wall. Disconnecting the hose takes five seconds and eliminates that entire category of failure.
- Turn off the water to exterior spigots at the shutoff valve if you have one. If your ADU was built by a competent plumber, there’s an interior shutoff for each exterior spigot. Close it, then open the exterior spigot to drain the short segment of pipe between the valve and the exterior.
- Leave cabinet doors open under all sinks. This lets the interior heat reach the supply lines in the toe kicks and exterior walls. Do this in both the kitchen and bathroom of the ADU, plus any laundry hookup.
- Drip both hot and cold faucets at a slow stream. Moving water freezes slower than stationary water. The drip should be just enough to see movement: a thin stream, not a fast one. You don’t need to run the shower, but if the ADU has an exterior-wall shower, leaving the bathroom faucet dripping usually keeps the branch line warm enough.
- Set the heat no lower than 60°F. If the ADU is occupied, normal living temperature is fine. If it’s vacant or used as a studio or office, make sure the heat is on before the freeze hits. A small ADU can drop below freezing inside within six hours at 20°F exterior temperature if the heat is off.
- If the unit will be unheated and vacant, winterize it. This means shutting off the water supply at the main valve, draining the system from the lowest point, and blowing out the remaining lines with compressed air. For a small ADU, a plumber can do this in under an hour. It costs $150 to $250, which is a fraction of the drywall and flooring repair after a burst kitchen supply line.
A note on freeze warnings: Houston’s freeze events are usually forecast two to four days out. That’s plenty of time to run this protocol, but only if you don’t wait until the night of the freeze. We’ve had calls from homeowners who waited until the temperature was already below freezing, and at that point the indoor shutoff valves are sometimes frozen in the open position.
Landlord vs. Tenant Responsibilities for Rental ADUs Under Texas Property Code
If you rent out your Houston ADU, the Texas Property Code draws a clear line between what the tenant handles and what the owner handles. The landlord is responsible for “repairing or remedying a condition that materially affects the physical health or safety of an ordinary tenant.” An air conditioner that fails in July is a material condition. A dripping bathroom faucet that works but wastes water is not.
What this means in practice for a Houston rental ADU:
- Landlord owns: HVAC system failure. In Houston, air conditioning is treated as essential, not optional. If the AC in your rental ADU fails between June and September, you are expected to repair it promptly. Courts in Harris County have consistently sided with tenants in cases where landlords delayed AC repair during Houston heat. Keep your condensate drain maintenance current, because the clog that causes the failure is your responsibility as the owner, not the tenant’s.
- Landlord owns: structural issues, roof leaks, exterior doors that won’t seal, and plumbing leaks. If water is coming in from outside, or the unit is structurally compromised, that’s the landlord’s duty under the implied warranty of habitability. This is why the April pre-hurricane inspection and October post-storm walkthrough are so important: catching a small roof leak in April costs $300 to $600. Ignoring it until the tenant reports ceiling damage in August costs $3,000 and a strained relationship.
- Tenant owns: routine housekeeping maintenance. This includes replacing air filters during their occupancy, keeping the interior clean and ventilated, promptly reporting leaks or suspected water damage, and not running the AC with windows open during a Houston summer. The tenant should also be expected to notify you immediately of any standing water around the structure or unusual sounds from the plumbing.
- Shared responsibility: pest control. If a tenant’s habits draw pests, that’s on the tenant. If the pests are entering through structural gaps, deteriorated crawl space screening, or exterior damage, that’s on the landlord. In practice, the landlord typically handles initial pest treatment after a report, and the tenant handles housekeeping to prevent recurrence.
The cleanest way to handle all of this is to put the maintenance calendar directly in the lease, with a written schedule for the filter changes, the condensate drain check, and the post-storm walkthrough. Tenants who know exactly what’s expected of them are cheaper to manage than tenants guessing at their responsibilities. The same principle applies the other way: when Sutton ADU Houston builds a unit for a landlord, we hand over a written maintenance schedule for the unit, because the Threshold Standard means the owner knows exactly what was built, how it was built, and what it needs to stay airtight in this climate.
Common Mistakes to Avoid
- Skipping the condensate drain because “the AC is still working.” The clog is silent right up until it isn’t, and by the time the water shows up in the floor, the damage is already done. We’ve seen $3,000 in flooring and subfloor damage from a $12 preventive task.
- Applying exterior caulk in June or July. Houston’s humidity will make the sealant skin over before it cures, and you’ll be redoing the same joints next year. Wait for January’s dry air.
- Treating a foundation crack as just a cosmetic issue without tracking it. Houston clay movement is predictable, but that doesn’t mean it’s always benign. Mark cracks with a pencil line and the date. If the crack extends past the line within a month, call a structural pro.
- Leaving the ADU unheated during a freeze because “it never gets that cold here.” Houston has recorded below-freezing temperatures in every month from November through March. The fact that it only happens a few nights a year doesn’t change what happens to an unheated PVC supply line at 24°F.
- Assuming a small unit doesn’t need the same inspection schedule as the main house. A detached ADU actually needs more frequent checking, because the systems are smaller, the thermal mass is lower, and the roof sheds water faster. Small problems become big problems more quickly in a small building.
- Ignoring drainage around a pier-and-beam crawl space. Standing water in a Houston crawl space for two weeks will produce mold that requires professional remediation. Regrade the soil and check drainage after every heavy rain season.
When to Call a Professional
Some tasks are safe and sensible to handle yourself: clearing a condensate line with a shop vac, swapping an air filter, checking door seals, photographing the unit before a storm. Other situations call for a trained eye. If you see foundation movement beyond the normal ranges described above, call a structural professional. If your HVAC system is short-cycling, icing up, or running without cooling, call an HVAC tech with experience on small detached units. If water has made its way into the interior of your ADU after a storm, don’t wait to see if it dries out on its own; in Houston’s humidity, it won’t. And if you’re planning maintenance on a unit that also needs repair or renovation work, a full-service builder can handle both at once. Sutton ADU Houston offers free estimates in Houston. Call (940) 242-3207 to schedule yours.
Frequently Asked Questions
Twice a year, minimum. The first service should fall in April or May, before the heat arrives, and the second in October, after the summer storm season. Houston’s climate puts roughly double the demand on a small detached unit compared to a national average location, and two seasonal services per year is the standard that keeps these systems running past the ten-year mark.
The maintenance schedule is largely the same: condensate drains clog, sealants fail, and filters load up regardless of whether the walls were panelized in a factory or framed on site. That said, factory-built units often have more precise sealing around joints and penetrations, because they were assembled in a controlled environment and then tightened on site. The upside is fewer air leaks out of the gate. The downside is that when a leak does develop, it can be harder to trace, because the construction doesn’t follow the same stud-by-stud logic a carpenter would recognize. Keep the manufacturer’s warranty documentation handy and don’t skip the inspection schedule the manufacturer specifies.
Expect to pay between $250 and $500 for a combined annual inspection covering HVAC, plumbing, roof, and drainage in the Houston area. A full service that includes HVAC tune-up, condensate drain cleaning, sealant inspection, and a structural walkthrough can run $400 to $700 depending on the unit’s size and age. That compares favorably with the $2,500 to $3,500 repair bill that follows a preventable condensate overflow or a roof leak that went unnoticed through a storm season, as detailed in our ADU Cost Breakdown: The Houston Homeowner’s Reference for 2026.
Yes. The Texas Property Code sets minimum standards, but it does not assign specific maintenance tasks to specific parties in a way that covers every situation. Putting the schedule in writing, with explicit dates and responsibilities, removes the ambiguity that leads to disputes. Include the filter change schedule, the condensate drain check, the post-storm walkthrough notice, and instructions for reporting water intrusion immediately. Landlords who do this spend less on repairs than landlords who rely on informal expectations.
Yes. Detached ADUs freeze faster and stay frozen longer than the main house, because they lack the shared thermal mass and the continuous heat load of a primary residence. Exposed plumbing under a pier-and-beam ADU is especially vulnerable during Houston’s hard freezes. The pre-freeze protocol in this guide, run correctly, will protect everything except the most exposed, uninsulated exterior pipes.
Routine maintenance, including the tasks in this guide, does not require a City of Houston permit. Work that changes the structure, the footprint, or the mechanical, electrical, or plumbing systems does. If your maintenance reveals damage that requires repair work beyond like-for-like replacement, check with the City of Houston’s permitting department before starting. The same applies to any work that touches the exterior cladding on a unit with a James Hardie system installed: leave alterations to a contractor who knows the warranty requirements, because improper repairs can void the manufacturer’s warranty. Call (940) 242-3207 for a free estimate if you’re unsure whether a repair falls under maintenance or permitted construction.
The Bottom Line
Houston ADU maintenance is less about effort and more about timing. The four intervention windows, April, June, October, and January, line up with the climate’s real behavior, not with a generic four-season calendar. The highest-value tasks are small: clear a drain line, swap a filter, check a door seal, inspect the ground line. But small tasks done at the wrong time, like caulking in July, are wasted effort, while small tasks skipped, like the condensate drain in June, become expensive failures by August. For Houston property owners, the discipline is the asset. Keep the schedule, document what you see, and call a professional when the signs point beyond normal wear. The cost of doing these tasks on time is a few hundred dollars a year at most. The cost of skipping them lands in the thousands, on the schedule Houston’s climate chooses for you.
Written by Miles Hartwell, Owner at Sutton ADU Houston, serving Houston since 2006.


